This proposal is to remove the existing three-span truss, steel girder, and timber bridge. The bridge will be replaced with a two-span bridge consisting of prestressed concrete voided slab beams / steel plate girders with a concrete deck founded on a spread footing and driven pile substructure.
This proposal is to remove the existing three-span truss, steel girder, and timber bridge. The bridge will be replaced with a two-span bridge consisting of prestressed concrete voided slab beams / steel plate girders with a concrete deck founded on a spread footing and driven pile substructure.
To submit a quote for a project we are bidding, either send email to bids@nadinc.com or fax to (509) 927-2010.
Please send bid questions to the same email and an estimator will respond.