Currently Bidding

Old River Road Over NF CDA River Bridge

  • April, 16 2026 1:30 PM
  • Kingston, ID

Project Role

Primary Contractor

Estimator

Zach Larsen

Scope

This proposal is to remove the existing three-span truss, steel girder, and timber bridge. The bridge will be replaced with a two-span bridge consisting of prestressed concrete voided slab beams / steel plate girders with a concrete deck founded on a spread footing and driven pile substructure.

Description

This proposal is to remove the existing three-span truss, steel girder, and timber bridge. The bridge will be replaced with a two-span bridge consisting of prestressed concrete voided slab beams / steel plate girders with a concrete deck founded on a spread footing and driven pile substructure.

Interested? Submit a Quote

To submit a quote for a project we are bidding, either send email to bids@nadinc.com or fax to (509) 927-2010.


Please send bid questions to the same email and an estimator will respond.